Static lines and anchor points for working at heights need to be inspected at regular intervals as per Australian Standard AS/NZS1891[fall arrest systems and devices] and AS/NZS4488 [industrial rope access sysetms], the manufacturer's instructions and/or the Workplace Health and Safety Act. A further unscheduled inspection will be required if a system is deployed to determine it is fit for use before it is returned to service.
Please note that minimum charges apply to site visits.
The inspection will involve:
PERMANENT STATIC LINES
Inspection Interval
- Fixed - 12 Monthly
- Webbing or Rope - we recommend 6 monthly
Type of Inspection - Formal Certified Inspection
Fixed Static Line |
Latchways Constant Force Post |
Frog Link |
Concrete Link |
TEMPORARY STATIC LINES
Inspection Interval - 6 Monthly
Type of Inspection - Formal Certified Inspection
Temporary Static Line |
TempLink Temporary Anchor Point |
Spyda Temporary Anchor Point |